Staffs industrial and construction projects across Sweden with welders, pipefitters, electricians, assemblers and insulation fitters, from pharma cleanrooms to data centers. States that workers hold ID06 cards.
Listings are compiled from public sources and are not endorsements or vetting. Rule summaries are not legal advice: always check the official source.
Staffs industrial and construction projects across Sweden with welders, pipefitters, electricians, assemblers and insulation fitters, from pharma cleanrooms to data centers. States that workers hold ID06 cards.
Foreign employers must register each posting to Sweden in Arbetsmiljöverket's e-service 'Anmäl utstationering' before the worker starts, and name a contact person. Swedish rules and collective agreements on working environment, hours, holiday, pay and tax apply.
Staffing agencies posting hired-out workers to Sweden must also follow parts of the Act on hiring out workers (2012:854): conditions at least as good as if the client hired directly, no fees charged to workers, and no blocking workers from joining the client.
ID06's rulebook for foreign companies and posted workers requires documentation such as proof of social-security affiliation (e.g. A1), work permit where needed and registration for income tax in Sweden before cards are issued. Cards can be ordered up to two weeks before they must be valid.
Since 1 January 2021 Sweden applies an economic-employer concept for income tax on temporary work, so the 183-day exemption no longer applies when EU/EEA workers work under the direction and control of a Swedish economic employer (as summarised in ID06's rulebook).
Any company doing electrical installation work on someone else's installation must register with Elsäkerhetsverket and run a self-audit scheme before starting. For temporary work the compliance officer can hold a Swedish or another EEA/Swiss authorisation; for indefinite work a Swedish authorisation is required.
Google broke ground on 2 June 2026 on a data center in Horndal designed for off-site heat recovery; it said it was already working with nearly 60 Swedish suppliers for construction and expects thousands of jobs via construction and suppliers.
atNorth confirmed (23 Feb 2026) plans for a 300 MW data center at Hamre Industrial Park in Långsele, Sollefteå, on a 50-hectare zoned plot, expected operational in H1 2028.
atNorth announced (29 Jan 2026) SWE02, a 30 MW metro data center near its SWE01 site in Stockholm, with heat reuse in collaboration with Stockholm Exergi.
Mistral AI and EcoDataCenter announced an AI-focused data center in Sweden with a reported $1.4 billion investment, slated to launch in 2027 (reported by Data Center Knowledge, March 2026).
Construction company founded in 2016 that has expanded to Sweden. It says it has completed 394 projects on residential and commercial work.
Grid contractor Dalekovod has won the whole Uppsala package: ten projects for new 400 kV lines between Mehedeby (Tierp) and Odensala (Sigtuna). The contract covers ground and civil works, pylon erection, demolition of existing lines and stringing; construction is planned to start in early 2027, with lines entering service in stages 2028–2032.
On 3 September 2026 the Swedish government appointed an inquiry (Dir. 2026:114) to propose criminal and other measures against the use of illegal labour throughout the subcontracting chain, including wider trading bans and corporate fines; it must report by 1 November 2027. The directive notes Arbetsmiljöverket has been tasked with improving the posted-worker register (utstationeringsregistret).
A 42 MWh battery park for the Hylte Paper mill was completed in Dec 2024 and entered trial operation. It helps the mill use its own generation, cut peaks and support the regional grid. Built by Soltech Energy Solutions.
CA Batteribalans ordered a 28 MWh battery park in Lerum for the ancillary services market, with commissioning expected in April 2025. Soltech Energy Solutions handles design, installation and commissioning (Nov 2024).
Falu Energi & Vatten's 12 MWh battery park in Falun went into operation in Dec 2024 to support the local grid and free capacity for new connections. Soltech Energy Solutions designed and built it.
Construction of an 18 MWh battery park for Nordic Solar began in Södertälje in July 2025. It is the company's first battery project in Sweden and will trade in ancillary services and on the spot market. Built by Soltech Energy Solutions.
The Port of Trelleborg has ordered a 4 MWh energy store to manage peaks when larger ships use onshore power, ahead of EU requirements. Takorama Elteknik (Soltech group) designs and installs it, with commissioning expected in 2026 (Jan 2026).
Volvo Group plans an energy park in Mariestad whose first stage is about 70 MW / 260 MWh of battery storage using Volvo Energy systems, expected to be operational in 2027. The site will also serve as a customer demonstration site near Volvo's planned battery cell plant (Sep 2026).
The 70 MW / 160 MWh Ånge BESS in SE2, owned by a Delta Capacity and Wood & Co. joint venture, started commercial operation in June 2026, 15 months after procurement began. Delta Capacity was EPC manager, with Sungrow (batteries), Stenger & Ibsen Construction (balance of plant) and Rejlers.
In Feb 2024 Ingrid Capacity and BW ESS started building storage at eight Swedish sites: Falköping, Karlskrona, Katrineholm, Mjölby, Sandviken, Vaggeryd, Värnamo and Västerås (8-20 MW each, 122 MW in total). This followed six sites started in 2023, bringing over 200 MW into construction.
Mirova is investing alongside Ingrid Capacity in a 100 MW / 200 MWh battery project in Vaggeryd (SE3), expected to reach ready-to-build status in 2027. Ingrid will develop, operate and optimise it (Sep 2026).
Ingrid's 100 MW / 200 MWh Horsaryd battery in Karlshamn (SE4) has a legally binding building permit. Construction is expected from 2026, with full operation planned for 2028 (Apr 2026).
Ingrid Capacity and the SEB Nordic Energy Fund, via Locus Energy, opened a 12 MW / 12 MWh battery store in Rättvik on 24 Sep 2025. It is run by Ingrid's trading platform.
A 24 MW battery in Gothenburg, owned by Ingrid and Locus Energy, takes part in Göteborg Energi Nät's local flexibility market Effekthandel Väst, which doubled to 70 MW in 2025 (Dec 2025).
In the week of 23 September 2026 Arbetsmiljöverket, the police, Skatteverket, Försäkringskassan and Migrationsverket checked 16 companies on four Västlänken construction sites. Arbetsmiljöverket found indications that foreign firms had not met the duty to register posted workers in the posting register; this may lead to two sanction fees after further investigation.
Arbetsmiljöverket, the police and Skatteverket inspected over 25 companies at Ringhals (Varberg), covering the Ringhals 1 and 2 decommissioning area and the Ringhals 3 outage. The focus was whether employers had notified postings and kept required information available. Some suspected formal shortcomings are under investigation; the agency calls it the first joint check of its kind at a Swedish nuclear plant. Published 5 June 2026.
—
One email a week: changes to the rules (posting notification, ID06 site ID cards, collective agreements), new inspections, and Swedish projects that need crews. Free.